Auto rack loading

  • Tracks A & B are GM tracks
  • Tracks C, D, E & F are Chrysler tracks
  • Once you receive the loading sheet, you will build a switch list based on the tracks the cars are in.
    Save it as a follow up ticket and be sure to add the switch list name 



 


  •             They will send in another email later with the shipped load summary. It will show from Chrysler or GM and you                                              would look at the carrier to determine the RWC to load the cars. 
  • Once loaded, you will add these switch instructions to the cars.